Feasibility Study and Design by:
HILGARTWILSON, LLC, Phoenix
Feasibility Study and Design Funded by:
Arizona Water Protection Fund
FOR:
Hereford Natural Resource Conservation District
The project is to construct an impoundment structure within Horseshoe Draw that will effectively slow the rate of discharge to downstream waters by detaining surface water runoff.
WHEN COMPLETED THE PROJECT WILL
Reducing Pathogens transport into San Pedro River
Reduce flood peaks to prevent further damage to roads and property downstream
Reduce and begin healing erosion and soil loss
Reduce sediment transport into San Pedro River
Increase groundwater recharge into the Upper San Pedro River Basin aquifer